LIEYING | Industrial Cleaning Solutions
+86 198 1384 2887 jane@air-mach.com
← Back to case studies Component Reconditioning

Engine and Transmission Part Degreasing

A reference workflow for aged oil sludge, grease and localized carbon on engine and transmission assemblies.

This case explains a representative duty and verification approach. Confirm the final configuration against site evidence, sample testing, duty cycle and safety conditions.

DUTY REVIEW

Define the Site Problem First

Old components often combine heavy lubricant residue with sensitive sealing faces, electrical connectors and precision-machined surfaces.

Industry
Component Reconditioning
Objects
Engine blocks, cylinder heads, transmissions and hydraulic components
Primary Soil
Oil sludge, grease, lubricant film and localized carbon

REFERENCE WORKFLOW

From Process to Verification

Protect sensitive areas first, then establish a repeatable process and acceptance criteria.

01

Process

Pre-inspect sensitive zones; use hot water for broad degreasing; reserve low-volume steam for gaps and stubborn local residue.

02

Equipment Direction

HP1525-ED or an HP-E configuration where indoor exhaust is restricted; SI electric steam for detail work.

03

Verification

Record before/after images, cleaning time, drainage handling, residue in critical areas and surface-protection results.

04

Operating Boundary

Pressure, temperature and nozzle selection must protect seals, labels, wiring and precision faces.

SIMILAR DUTY

Ask an Engineer to Review Your Site.

Send the object, soil, photos or video, power, water, drainage, ventilation and continuous duty for an initial process direction.

Send Duty Details

CONTACT AN ENGINEER

Send the site conditions.
Get a practical equipment recommendation.

Prepare photos or video of the object, soil type, available power and water, daily duty and required result.

Call Email

+86 198 1384 2887
jane@air-mach.com